Heim Aktiver Leistungsfilter

Comparing Quotations for Tin Packaging on the Same Specification

Comparing Quotations for Tin Packaging on the Same Specification

Sep 30, 2026

We got 2 quotes on a rectangular mint tin. Both are the same size, printed in CMYK and 5,000 pieces. One has individual protective packing and an insert. And the other says “standard packing” and sampling charged separately.

The unit prices are easy to compare. What you get for those prices takes a bit more work.


Quick Answer:

 

  • Comparing quotations for tin packaging with the same specification means matching product requirements, quantities and costs included in each offer.
  • One RFQ including tin dimensions, lid construction, tinplate thickness, coatings, artwork, inserts and export packing.
  • Quantities per design to be confirmed, tooling and sampling charges and which extras are included, additional or to be confirmed.
  • Compare prices in one currency, same Incoterms rule, named delivery point and validity of quotation.
  • Determine the total order cost for such agreed scope; only include charges not already included in the supplier’s price.
  • When selecting a supplier, ensure to check physical samples, acceptance criteria and production timing. Matching specifications does not mean the results will be the same.

Begin with a Single Written Tin Specification

 

Same Tin Size. Different Quotation Scope

Send the same RFQ to every supplier with dated drawing, artwork and packing revisions. Have them confirm the requirements and note any differences.

'Same size, four-colour printing' leaves a lot to be decided. Two tins may be identical in outside dimensions but different in internal space, lid construction, coatings or packing arrangements.

Use a checklist of specifications before price comparison:

Item What the quotation should confirm
Dimensions and drawing Outside dimensions, critical internal dimensions, measurement definitions, drawing revision and key tolerances
Lid and construction Slip, hinged or slide lid; edge and seam construction; required opening and closing performance
Material Tinplate thickness and any other agreed material specifications
Printing coverage Lid, body, base and inside printing; approved artwork revision
Colours and background CMYK or spot colours, white underprint, exposed metallic areas and colour reference
Coatings and finishes Internal coating, gloss or matt finish, special finishes and embossing
Inserts and components Material, dimensions, quantity and whether assembly is included
Order quantities Total quantity, quantity per design and number of artwork versions
Individual protection Bags, sleeves or other protection; assembled, separated or nested tins
Export packing Pieces per carton, carton specification, shipping marks and pallet requirements
Use and acceptance Product application, destination market, reference sample and agreed checks

If a supplier proposes an alternative thickness or packing, ask for a separate alternative quotation. Retain the original specification for comparison.


Match Amounts and Artwork Versions

 

5,000 tins with one artwork is a different production brief than 5,000 tins with several designs. Check the number of units for each price quoted including any minimum quantity per version.

Do not put a 10,000 piece price break next to a 5,000 piece offer as if the buying commitment were the same.

Also see what is included in “existing mould”. A suitable body mold does not mean the need for new embossing tools, print preparation or insert development. See Multiple Tin Designs in One Order: What Can Share a MOQ? for multiple versions.


Separate Unit Prices from Extra Costs

 

What Does the Unit Price Include

Ask suppliers to indicate whether each applicable charge is Included, Additional, Not Required or To Be Confirmed. A blank cell is not zero.

Tooling check, embossing dies, print preparation, sampling, sample courier charges, insert development, testing & inspection. Verify if quoted extras are per order, per design or per tool.

If a sample fee is applied against production, note the conditions and when the credit applies. deduct only a credit agreed for the order being compared;

Separate first order and repeat order costs. If you already have a tool for a reorder there may be new charges if there are changes to the artwork or components. The custom cookie tin quotation breakdown goes into greater detail on manufacturing cost drivers.


Put Delivery Terms and Freight on the Same Basis

 

Compare Delivery Scope, Not Just Tin Price

“FOB” without a named port leaves an important detail unresolved. Record the Incoterms rule, named place or port and version e.g. “FOB [named port], Incoterms® 2020”.

The ICC’s Incoterms® 2020 rules define how delivery obligations, costs and risks are shared between buyers and sellers.[1] They do not replace the tin spec or sample approval. International Chamber of Commerce

The simplest way to compare is to ask for both quotations on the same delivered basis. Otherwise, find out the other costs that will take you to the same place. Add costs not included in quoted scope.

The landed-cost guidance of the International Trade Administration considers product price, freight, insurance, tariffs, taxes and other fees to arrive at a full delivered-cost calculation.[2] Request carton quantities, dimensions, gross weight, estimated cubic meters and pallet details. trade.gov

Keep estimates clearly marked until confirmed. Individual protective packaging can change the volume of the shipment. So good tin price may need different freight.


Comparison of Samples and Acceptance Requirements Next to Price

 

Compare Delivery Scope, Not Just Tin Price

“Sample included” – what does that mean? A digital render, an unprinted stock tin and a printed pre-production sample answer different questions.

Check equivalent samples for lid fit, opening and closing, edge finish, dimensions, printing and finish. Agree how production is checked against the approved sample and specification, who arranges and pays for inspection.

For food tins, request documentation related to the actual materials, coatings, intended contact and destination market. The FDA guidance ties the regulatory status of an ingredient substance to the intended conditions of use of the project in the US.[3] The details are not substituted by a general factory certificate. FDA

The food-contact document checklist can assist in organizing the request.


Example: When the Lower Unit Price is More Expensive

 

Example: These figures illustrate the calculation, not actual Jinyu customer orders or current market prices.

The buyer wants 5,000 tins with one design. Quote A does not speak of protecting individuals. Quote B does. The buyer asks both suppliers to confirm the same specification including inserts, protection and acceptance requirements, before comparing the two revised offers.

The comparison of goods and confirmed net additional charges is as follows: Freight and import costs are separate.

Comparison item Quote A Quote B
Quantity 5,000 pcs 5,000 pcs
Unit price USD 0.64 USD 0.70
Goods subtotal USD 3,200 USD 3,500
Confirmed net additional charges USD 450 USD 100
Total for the stated scope USD 3,650 USD 3,600
Allocated cost per tin USD 0.73 USD 0.72

Apply this formula:

Cost for the agreed scope = unit price × quantity + net additional charges not otherwise included.

Quote A saves USD 300 on goods and is six cents per tin cheaper. The total of the compared order is USD 50 higher, USD 350 of the additional charges.

That flips the price ranking, but does not automatically choose Quote B. Samples, delivery costs and commercial terms to be confirmed. If the specifications are still different, ask for clarification, don’t assume the totals are equal.


Check the Commercial Details Before Approving the Order

 

A full comparison is also needed

  • Currency and validity: Validity of quotation, Exchange rate and date of comparison, Payment milestones and bank charges
  • Quantity allowance. Overproduction or short delivery allowed, how it applies per design and quantity actually invoiced.
  • Timing: When sampling starts, when production starts, separate completion, dispatch and arrival dates for production.
  • Tools and parts: You own, store and use the paid tooling and remaining parts.
  • Changes and claims: How the changes to the specification will affect price and how defects, replacements or credits will be dealt with.

Before approval collect specification, quantity breakdown, cost schedule, delivery basis and sample acceptance requirements confirmed. Take down any remaining questions.


FAQs

 

Why do quotes for the same tin size vary?

Outside dimensions describe only part of the product. Material, construction, printing, inserts, packing, quantities and delivery scope may differ.

Should I compare the unit price or the total order cost?

Keep both visible. The unit price helps compare goods costs; the total shows what the agreed order requires you to pay.

How do I compare EXW and FOB tin quotations?

Request quotations using one agreed delivery basis and named location. If that is unavailable, obtain the missing logistics costs needed to compare delivery to the same destination.

Are tooling and sample fees always included?

No. Confirm each charge and any credit conditions. Do not assume that an existing mould makes every preparation or sampling service free.

What if a supplier proposes a different specification?

Ask for the requested specification and the alternative as separate offers. Assess the alternative’s price and performance on its own merits.

Does the same specification guarantee identical sample quality?

No. Shared specifications make comparison clearer, but physical samples and agreed production checks are still needed to assess the result.


Request for a comparable Tin quotation

 

For a Jinyu quotation, send the drawing, lid type, artwork, quantity per design, finishes, inserts, packing requirements and delivery destination. Include the intended use and target delivery date so the offer can identify included costs, proposed changes and unresolved items.


References and further reading

 

  1. International Chamber of Commerce, Incoterms® 2020. Costs and risks of delivery obligations under the agreed trade rule.
  2. International Trade Administration Establishment of Total Export Price. Elements of the total landed cost.
  3. US Food and Drug Administration — Determining the Regulatory Status of Components of a Food Contact Substance. Authorization of the component and intended conditions of use.

cookie and biscuit tin

Brauchen Sie Hilfe? eine Nachricht hinterlassen

eine Nachricht hinterlassen
Wenn Sie an unseren Produkten interessiert sind und weitere Einzelheiten erfahren möchten, hinterlassen Sie bitte hier eine Nachricht. Wir werden Ihnen so schnell wie möglich antworten.
send

Heim

Produkte

Kontaktiere uns

Rollendes Tablett